This module surveys key legal and regulatory issues surrounding the movement of energy. The module begins with a discussion of transportation of fossil fuels via pipelines. It then turns to critical issues surrounding electric power transmission planning, siting, and cost allocation. The implications of emerging energy technologies, including microgrids, distributed energy resources, storage, and hydrogen, are also discussed.
I. Transporting Fossil Fuels
Energy in the form of fossil fuels has long been moved across vast distances by pipeline, rail, and ship. Each mode raises distinct statutory and jurisdictional frameworks, but common legal issues routinely emerge: the scope of environmental review, the use of eminent domain to assemble rights-of-way, the potential for liability from accidents and spills, and the tension between state and federal authority.
A. Gas Pipelines
Natural gas pipeline expansion has become a contentious legal issue, especially as the growth of fracking and the retirement of coal-fired power plants have expanded U.S. domestic natural gas production and use.
Under section 7 of the Natural Gas Act (NGA),
interstate natural gas pipelines must obtain a certificate of public convenience and necessity from the Federal Energy Regulatory Commission (FERC). Once granted, a Section 7 certificate confers upon a pipeline developer eminent domain power to take private (and even state-owned) land for a route—subject, of course, to “just compensation” under the 5th Amendment of the U.S. Constitution. While it is always controversial when a federal regulator affords eminent domain authority to a private pipeline developer, in PennEast Pipeline Co. v. New Jersey, the U.S. Supreme Court reasoned that by ratifying the Constitution, states accepted the federal eminent domain power, which the U.S. Congress then validly delegated to FERC certificate holders.
Under the National Environmental Policy Act (NEPA), FERC—the lead agency for any interstate gas pipeline project—must evaluate a proposed pipeline’s environmental impacts. In approving gas pipeline proposals, NEPA requires FERC to conduct an Environmental Assessment (EA) and, upon a finding of significant impact, a full Environmental Impact Statement (EIS) for the project. More than two decades ago the Supreme Court made clear that agencies conducting NEPA review are not required to consider environmental effects that are too far removed or outside their jurisdictional control, effectively limiting review to effects with a “reasonably close causal relationship” to the federal action.
As climate science has consistently identified foreseeable carbon and climate impacts from the extraction, transportation, and use of fossil fuels such as natural gas, litigants have tested the extent to which the foreseeable climate impacts of new pipeline projects fall within the scope of NEPA’s review requirements. Prior to 2025, lower courts were receptive to some of these arguments, but in Seven County Infrastructure Coalition v. Eagle County, Colorado, the Supreme Court cast doubt on the use of NEPA as the sole basis for requiring an agency to consider carbon impacts in pipeline siting.
Seven County reversed a U.S. Court of Appeals for the District of Columbia (D.C.) Circuit decision holding that the federal Surface Transportation Board had violated NEPA by failing to sufficiently consider the reasonably foreseeable effects of increased upstream fossil fuels production and downstream refining activity that would be facilitated by a railway line that would ship crude oil. The Court emphasized that “NEPA is a procedural cross-check, not a substantive roadblock,” and “[t]he goal of the law is to inform agency decisionmaking, not to paralyze it.”
Agencies must evaluate the effects of the specific “proposed action” they are considering, the Court reasoned, but this does not include “other future or geographically separate projects that may be built (or extended) as a result of or in the wake of the immediate project under consideration.”
In suggesting that a federal agency’s NEPA review is entitled to “substantial deference,” the Court also clarified that agencies are not required to analyze the environmental impacts of projects they have no authority over.
Seven County will not, however, end legal challenges to the environmental and carbon impacts of federal pipeline approvals. Independent of NEPA’s procedural requirements, the NGA delegates pipeline approval authority to FERC under a broad public interest standard. Though to date no court appears to have read the NGA to require FERC to evaluate downstream climate impacts in approving a gas pipeline, FERC would appear to have the discretion to consider them under the NGA’s public interest standard, which is subject to arbitrary and capricious review by courts.
To the extent that FERC has authority to deny permission for or place conditions on a pipeline for environmental reasons under the NGA, the authorization of a pipeline potentially may still be considered a legally relevant cause of downstream carbon emissions for purposes of project review under the NGA. Since the NGA requires FERC to determine the need for a new pipeline and the agency also has an obligation to address whether the pipeline is in the public interest, this may open the door to an argument that FERC should consider climate impacts under the NGA—completely independent of NEPA.
FERC also has its own rules and guidelines related to pipeline “segmentation” and has obligations to not look too narrowly at the costs and benefits of pipeline projects when determining rates under the NGA. For example, an applicant cannot break a pipeline project into separate application submissions simply to avoid FERC’s consideration of the overall impacts of the project. The carbon impacts of pipelines are thus likely to continue to be raised in challenges to pipeline approvals even after the deferential approach to NEPA review the Supreme Court endorsed in its 2025 Seven County decision.
Pipeline approvals also routinely present independent environmental concerns under the Clean Water Act (CWA). Under Section 401 of the CWA, a state can potentially block federal approvals by denying water quality certifications for projects that may harm state waters.
New York wielded this power to stop the “Constitution” Pipeline—a natural gas line that would extend from Pennsylvania’s shale fields into New York. In 2016, the New York Department of Environmental Conservation denied Constitution’s water permit after determining the pipeline failed to show it wouldn’t pollute streams and wetlands. In upholding New York’s decision, the U.S. Court of Appeals for the Second Circuit found “no basis” to disturb the state’s decision, confirming that federal law entitled the state to conduct its own rigorous review of environmental impacts notwithstanding FERC’s approval.
As New York’s rejection of the Constitution pipeline demonstrates, even when Congress centralizes certain approvals (like interstate gas pipeline certification with FERC), states may still exert potential vetoes by raising issues with property rights or required environmental permits.
In a similar manner, required environmental approvals under the Clean Air Act (CAA) and the Endangered Species Act (ESA) can make or break a gas pipeline project. Compressor stations that pressurize gas along a pipeline route require air permits from state authorities acting under the CAA, and those permitting decisions are judicially reviewable—including for failure to consider disproportionate health impacts on nearby communities.
Pipeline construction also typically requires the U.S. Fish and Wildlife Service to issue a biological opinion and incidental take statement under ESA Section 7, and deficiencies in those documents can halt construction across the entire project.
B. Crude Oil and Adjacent Product Pipelines
Unlike natural gas pipelines, oil pipelines lack a comprehensive federal siting regime and rely on state law for permitting, including eminent domain authority. Most states review oil pipeline applications under a public convenience and necessity standard. To the extent that the pipeline provides a “public use” (such as common carriage or the customer service obligations of a public utility under state law), pipeline developers are allowed to condemn private land (subject of course to “just compensation”). By statute, states almost uniformly recognize pipelines as eligible for eminent domain, but the threshold showing of public benefit (including the judicial willingness to second-guess it) can differ significantly across jurisdictions.
As an example of an expansive approach to public use, the Iowa Supreme Court upheld the use of eminent domain for the highly controversial Dakota Access crude oil pipeline. The court found that even a pipeline mainly transporting North Dakota-produced oil through Iowa for primarily out-of-state delivery meets public use requirements under Iowa and federal law.
While the court recognized climate change concerns that opponents of the pipeline project had raised, it reasoned that these were policy questions for the political branches of government, not a legal hurdle to issuing a pipeline permit and conferring eminent domain authority to the pipeline as a public use.
The Dakota Access Pipeline controversy highlights how complexities can arise with oil pipelines when federal regulatory approvals are also implicated. Initially, a 1,172-mile pipeline from North Dakota to Illinois was stalled by massive protests and litigation. Federal courts ultimately found that the U.S. Army Corps of Engineers (the Corps) had violated NEPA by issuing permits without a full EIS for a crucial Missouri River crossing. In 2020, the District Court for the District of Columbia vacated the Corps’ easement for the Lake Oahe crossing and even ordered the pipeline (then in service) to be emptied of oil pending completion of the EIS.
On appeal, the D.C. Circuit affirmed vacatur of the easement but reversed the shutdown injunction, holding that the traditional four-factor test for injunctive relief had not been met.
The state pipeline siting framework is also increasingly becoming a means for adjacent products that may promote carbon reduction technologies. In Texas Rice Land Partners v. Denbury Green Pipeline, landowners challenged a pipeline intended primarily to transport carbon dioxide (CO2) for the developer’s own use.
The court established that a pipeline must show a reasonable probability that it will serve third parties in order to qualify as a common carrier with condemnation power. On remand, the developer was able to demonstrate contracts to ship others’ CO2, so the court ultimately found the pipeline met the public-use test.
Also, in the Midwest, Summit Carbon Solutions proposed a multistate CO2 pipeline network to transport captured emissions from ethanol plants to a North Dakota storage site. Lacking a federal siting framework, Summit sought state pipeline permits and began negotiating easements. Resistance was fierce. By 2023, Summit had filed over 150 eminent domain lawsuits against holdout landowners in South Dakota alone, provoking public backlash. South Dakota’s governor ultimately signed a new law in 2025 banning the use of eminent domain for CO2 pipelines, throwing the project’s future into question. A legislative declaration that CO2 pipelines are not a public use could signal a novel legal pressure point and highlights how efforts to promote carbon capture may potentially force reexamination of what public necessity means as technological and other changes are made to our energy system.
While pipeline safety standards are federal, within the United States, pipeline companies generally cannot hide behind federal preemption to avoid negligence claims for accidents.
Courts often allow traditional tort suits to proceed, on the theory that complying with minimum federal standards is not a shield against liability for failure to meet more exacting state standards.
As with fossil fuel producers, plaintiffs may seek to hold operators of fossil fuel pipelines liable as a public nuisance because of their contributions to climate change and other potential environmental harms. Such public nuisance claims brought in federal courts have been dismissed as raising nonjusticiable political questions or as preempted by federal environmental laws,
but similar state-based claims continue to be tested in state courts around the country (see Overview of Climate Litigation for a deeper discussion of these issues and cases). In its October 2026 term, the Supreme Court will consider whether federal law precludes state-law claims seeking relief for certain climate-related injuries.
C. Oil and Coal Transport Regulation
The transport of fossil fuels by rail and ship raises parallel legal issues, albeit under different statutes. When the mid-2010s oil boom outpaced pipeline capacity, energy companies turned to railroads to move crude oil. A series of fiery derailments, such as the 2013 Lac-Mégantic disaster in Quebec, led to a public safety outcry.
However, states found their hands largely tied in directly regulating rail transportation of oil. The federal Hazardous Material Transportation Act (HMTA) broadly preempts state or local regulations “managing or governing” rail operations.
For example, after a spate of derailments of volatile Bakken crude, the state of Washington enacted a law setting a volatility limit on crude oil shipped by rail into the state. In 2020, the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) declared Washington’s rule preempted, concluding that it unreasonably interfered with nationwide hazardous material standards and the commerce of rail shipments.
The U.S. Court of Appeals for the Ninth Circuit agreed that federal law occupies the field of railroad permitting.
Similarly, federal courts have struck down on preemption grounds states’ attempts to mandate minimum crew sizes or routing restrictions for oil trains. Risk mitigation for oil-by-rail has thus depended on federal measures (like upgraded tank car standards) and voluntary industry practices, rather than state or local ordinances.
Maritime transport of oil and liquified natural gas (LNG) is governed by a combination of federal and international law, leaving limited space for state regulation. Domestic shipments must comply with the Jones Act, which can encourage the use of less environmentally friendly domestic means of shipping oil.
Major oil spills from tankers (for instance, the 1989 Exxon Valdez spill) led to robust federal liability and safety regulation via the Oil Pollution Act of 1990, preempting many state-level rules (though states can impose additional liability up to certain limits).
Siting of oil export or import terminals involves federal agencies (such as the U.S. Department of Transportation’s Maritime Administration, MARAD, and the U.S. Coast Guard for deepwater ports) and often triggers environmental reviews under statutes like NEPA
and the Coastal Zone Management Act (CZMA),
where states have consultative roles. In practice, while a state cannot directly forbid oil tankers off its coast if federal permits are in order, states still may influence outcomes through the CWA, as well as in the exercise of their coastal permitting and public trust obligations. With LNG, however, FERC appears to have broad preemptive authority over states—though environmental review statutes like NEPA still apply.
II. Electric Power Transmission Planning, Siting, and Cost Allocation
Once electric power is generated—whether by solar, wind, nuclear, or fossil fuels—it is connected to load centers via high-voltage transmission lines and ultimately delivered to retail customers via lower-voltage lines that are typically owned by a local distribution utility. Historically, this was often handled by a single firm that operated as a vertically integrated utility, subject to regulatory oversight by a state utility regulator. However, with the rise of competitive interstate electricity markets, many power generators producing energy do not own transmission lines and transmission has become more of a national issue. Expansion of low-carbon power production, including solar and wind energy, is creating an urgent need to update existing transmission lines and to build new lines in areas where transmission has not previously existed, making this one of the most significant infrastructure issues facing the energy industry today.
A. Legal Oversight of the Transmission Grid
Legal oversight of the electric power grid is highly fragmented. In contrast to natural gas pipeline siting, where the NGA gives FERC the primary regulatory role in approving new pipelines, under the Federal Power Act (FPA) FERC has no authority over the siting of electric transmission lines that span across private property. Transmission siting approvals (including eminent domain authority) are exercised almost entirely by state utility regulators and siting boards.
Not surprisingly, since a single state holdout can keep a transmission line from moving forward, many new transmission line projects that are needed to support sources of energy such as wind and solar (often located in areas distant from customer load) can experience significant delays. Property owner and state opposition to new transmission lines is often intense, and so too are the legal conflicts that can ensue.
While the regulation of transmission siting is highly fragmented, once an interstate transmission line is built, FERC supervises its operation under the FPA. Under the FPA, FERC has jurisdiction over the sale of energy at wholesale and electricity transmission facilities that are used in these interstate power sales.
FERC also has an obligation under the FPA to ensure that the rates for wholesale power transactions and transmission, including any terms and conditions related to wholesale sales, are just, reasonable, and nondiscriminatory.
Since FERC’s landmark Order 888 was issued in the mid-1990s,
federal policies have consistently embraced competitive wholesale markets as the primary tool for incentivizing and balancing the supply and demand for electric power on the grid. FERC has focused its primary regulatory efforts on removing barriers to entry for wholesale power markets, including barriers to transmission service, by regulating transmission lines to ensure that transmission access is provided to all sources of energy under open access principles that protect against discriminatory economic treatment.
For most customers in the United States, FERC has approved what are known as organized wholesale markets. These market areas do not always neatly map onto state geographic borders, but they include most of the Mid-Atlantic, New England, and Midwest states, as well as California and New York (see Figure 1). In organized markets, voluntary Regional Transmission Operators (RTOs) composed of transmission-owning utilities serve a role similar to an air traffic controller in managing the grid to ensure reliability. RTOs also operate wholesale electricity markets and oversee the planning for new regional transmission lines, subject to some FERC oversight. (Though small portions of Texas are in RTOs subject to FERC oversight, for most of Texas the state oversees the Electricity Reliability Council of Texas as a wholesale grid operator and power market independent of FERC.)